Hotline of power engineering specialists:
Grid Connection
3 quarter
Grid connection in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
|
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Connected capacity, MW |
-10,7 |
195.2 |
233.4 |
178.3 |
218,3 |
175,9 |
Number of concluded contracts, pcs. |
4,7 |
12 557 |
11 103 |
1 558 |
12 677 |
12 946 |
Number of connections, pcs. |
-8,6 |
10 475 |
11 506 |
7 900 |
11 273 |
7 689 |
including connections up to 15 kW, pcs. |
-10,7 |
9 827 |
10 768 |
7 203 |
10 726 |
7 114 |
Connected capacity broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW |
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Belgorodenergo |
-17,5 |
40.5 |
43.6 |
36.5 |
40,3 |
29,9 |
Bryanskenergo |
32,2 |
7.8 |
12.9 |
10.4 |
7,7 |
13,7 |
Voronezhenergo |
-49,2 |
21.4 |
30.7 |
27.3 |
30,9 |
21,5 |
Kostromaenergo |
-2,3 |
17.3 |
18.6 |
13.2 |
15,0 |
9,7 |
Kurskenergo |
6,1 |
10.4 |
11.8 |
9.7 |
11,5 |
10,6 |
Lipetskenergo |
-19,7 |
15.9 |
17.0 |
18.2 |
16,3 |
15,0 |
Orelenergo |
67,1 |
12.2 |
11.6 |
9.4 |
8,7 |
10,6 |
Smolenskenergo |
-11,4 |
15.5 |
17.9 |
14.6 |
23,2 |
12,3 |
Tambovenergo |
14,3 |
8.8 |
9.5 |
2.7 |
14,9 |
9,8 |
Tverenergo |
31,7 |
21.6 |
25.0 |
13.6 |
23,3 |
23,7 |
Yarenergo |
-6,7 |
23.8 |
34.9 |
22.7 |
26,5 |
19,2 |
Number of concluded contracts broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Belgorodenergo |
-3,8 |
2 051 |
1 842 |
2 005 |
2 635 |
1 593 |
Bryanskenergo |
37,5 |
389 |
322 |
468 |
515 |
499 |
Voronezhenergo |
-2,6 |
1 437 |
1 378 |
1 572 |
1 805 |
2 057 |
Kostromaenergo |
-10,6 |
1 034 |
952 |
879 |
910 |
1 422 |
Kurskenergo |
5,3 |
657 |
567 |
720 |
734 |
937 |
Lipetskenergo |
2,9 |
1 030 |
1 016 |
1 233 |
1 106 |
1 943 |
Orelenergo |
59,8 |
967 |
664 |
590 |
566 |
436 |
Smolenskenergo |
15,6 |
1 250 |
816 |
1 026 |
1 138 |
1 119 |
Tambovenergo |
13,5 |
470 |
457 |
424 |
476 |
272 |
Tverenergo |
-3,3 |
1 560 |
1 645 |
1 371 |
1 228 |
1 358 |
Yarenergo |
-3,7 |
1 492 |
1 513 |
758 |
1 284 |
1 355 |
Number of connections broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Belgorodenergo |
-30,6 |
1 866 |
1 848 |
1 341 |
2 426 |
1 261 |
Bryanskenergo |
13,7 |
315 |
336 |
246 |
626 |
303 |
Voronezhenergo |
-24,7 |
1 021 |
1 461 |
1 062 |
1 836 |
685 |
Kostromaenergo |
-18,2 |
1 139 |
1 136 |
812 |
861 |
511 |
Kurskenergo |
1,8 |
504 |
605 |
465 |
492 |
591 |
Lipetskenergo |
-5,1 |
972 |
902 |
835 |
896 |
981 |
Orelenergo |
54,1 |
627 |
643 |
491 |
577 |
267 |
Smolenskenergo |
3,5 |
947 |
867 |
650 |
877 |
610 |
Tambovenergo |
16,0 |
376 |
427 |
60 |
290 |
488 |
Tverenergo |
22,2 |
1 408 |
1 427 |
901 |
924 |
1 072 |
Yarenergo |
-9,5 |
1 300 |
1 854 |
1 037 |
1 468 |
920 |
Number of connections up to 15 kW broken down by Branches in 2018 – 2022
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Belgorodenergo |
-34,2 |
1 691 |
1 660 |
1 149 |
2 279 |
1 147 |
Bryanskenergo |
13,3 |
298 |
309 |
225 |
604 |
274 |
Voronezhenergo |
-25,6 |
973 |
1 398 |
995 |
1 782 |
598 |
Kostromaenergo |
-21,6 |
1 046 |
1 047 |
737 |
792 |
472 |
Kurskenergo |
-0,2 |
471 |
573 |
430 |
473 |
562 |
Lipetskenergo |
-8,6 |
901 |
852 |
762 |
850 |
940 |
Orelenergo |
53,0 |
606 |
626 |
475 |
562 |
255 |
Smolenskenergo |
2,0 |
885 |
769 |
552 |
817 |
562 |
Tambovenergo |
16,4 |
355 |
392 |
50 |
268 |
451 |
Tverenergo |
20,1 |
1 367 |
1 387 |
881 |
886 |
1 001 |
Yarenergo |
-9,7 |
1 234 |
1 755 |
947 |
1 413 |
852 |
Connected capacity structure by categories of applicants in 2018 – 2022
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
% |
Начальное изменение |
3Q 2018 |
3Q 2019 |
3Q 2020 |
3Q 2021 |
3Q 2022 |
Up to 15 kW |
1,9 |
57.1 |
52.4 |
47.0 |
59,4 |
48,1 |
From 15 to 150 kW |
9,8 |
19.9 |
21.9 |
27.5 |
17,9 |
25,9 |
From 150 to 670 kW |
-0,5 |
9.7 |
9.8 |
11.9 |
6,3 |
8,6 |
670 kW and above |
-11,2 |
13.3 |
15.9 |
13.6 |
16,4 |
17,4 |
Connected capacity structure by categories of applicants in 3Q 2022