Grid Connection
1 quarter
Grid connection in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
|
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Connected capacity, MW |
291,5 |
419,3 |
173,2 |
215,7 |
304,5 |
167,4 |
Number of concluded contracts, pcs. |
-2,3 |
6 933 |
8 915 |
9 863 |
7 145 |
7 654 |
Number of connections, pcs. |
18,3 |
6 945 |
7 218 |
8 922 |
14 770 |
7 884 |
including connections up to 15 kW, pcs. |
15,8 |
6 356 |
6 664 |
8 350 |
13 978 |
7 309 |
Connected capacity broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW |
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Belgorodenergo |
28,0 |
24,2 |
28,1 |
27,6 |
31,0 |
14,5 |
Bryanskenergo |
553,6 |
18,3 |
10,2 |
4,3 |
6,2 |
6,8 |
Voronezhenergo |
2812,4 |
282,5 |
24,9 |
52,7 |
51,3 |
41,2 |
Kostromaenergo |
34,0 |
14,2 |
9,6 |
18,2 |
17,9 |
15,5 |
Kurskenergo |
-9,5 |
6,7 |
3,4 |
12,4 |
20,8 |
15,3 |
Lipetskenergo |
-4,7 |
6,1 |
11,4 |
15,6 |
82,0 |
11,9 |
Orelenergo |
-6,5 |
7,2 |
6,8 |
6,9 |
11,9 |
5,3 |
Smolenskenergo |
84,9 |
19,6 |
25,6 |
18,7 |
19,1 |
12,8 |
Tambovenergo |
20,3 |
7,7 |
3,9 |
10,9 |
15,3 |
5,8 |
Tverenergo |
21,0 |
14,4 |
16,1 |
26,2 |
23,6 |
21,3 |
Yarenergo |
25,2 |
18,4 |
33,2 |
22,2 |
25,4 |
17,0 |
Number of concluded contracts broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Belgorodenergo |
4,2 |
1 147 |
1 528 |
1 539 |
821 |
1 074 |
Bryanskenergo |
-9,5 |
220 |
283 |
344 |
324 |
289 |
Voronezhenergo |
-11,2 |
835 |
1 350 |
1 592 |
1 191 |
1 280 |
Kostromaenergo |
21,2 |
783 |
664 |
774 |
569 |
617 |
Kurskenergo |
19,4 |
376 |
564 |
589 |
407 |
467 |
Lipetskenergo |
-11,4 |
523 |
685 |
1 004 |
875 |
852 |
Orelenergo |
22,5 |
359 |
312 |
433 |
241 |
263 |
Smolenskenergo |
-15,7 |
592 |
772 |
971 |
539 |
612 |
Tambovenergo |
4,6 |
298 |
289 |
316 |
288 |
287 |
Tverenergo |
-8,5 |
896 |
1 454 |
1 219 |
858 |
926 |
Yarenergo |
-10,0 |
904 |
1 014 |
1 082 |
1 032 |
987 |
Number of connections broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Belgorodenergo |
4,3 |
1 074 |
1 392 |
1 275 |
1 748 |
1 010 |
Bryanskenergo |
-7,8 |
235 |
371 |
345 |
487 |
356 |
Voronezhenergo |
70,8 |
1 028 |
1 468 |
1 279 |
2 858 |
1 416 |
Kostromaenergo |
31,4 |
841 |
524 |
786 |
1 056 |
603 |
Kurskenergo |
50,2 |
425 |
256 |
577 |
901 |
647 |
Lipetskenergo |
27,2 |
458 |
792 |
863 |
2 050 |
736 |
Orelenergo |
-31,8 |
343 |
307 |
379 |
824 |
269 |
Smolenskenergo |
-18,6 |
531 |
748 |
997 |
1 219 |
630 |
Tambovenergo |
11,0 |
272 |
110 |
353 |
642 |
322 |
Tverenergo |
23,7 |
855 |
572 |
1 028 |
1 500 |
908 |
Yarenergo |
45,0 |
883 |
678 |
1 040 |
1 485 |
987 |
Number of connections up to 15 kW broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Belgorodenergo |
-1,6 |
930 |
1 242 |
1 161 |
1 604 |
937 |
Bryanskenergo |
-11,6 |
214 |
345 |
337 |
470 |
338 |
Voronezhenergo |
65,7 |
971 |
1 395 |
1 195 |
2 653 |
1 316 |
Kostromaenergo |
36,4 |
753 |
466 |
688 |
986 |
546 |
Kurskenergo |
46,5 |
397 |
250 |
545 |
859 |
620 |
Lipetskenergo |
30,7 |
434 |
758 |
812 |
1 962 |
671 |
Orelenergo |
-33,7 |
324 |
297 |
368 |
810 |
253 |
Smolenskenergo |
-24,5 |
460 |
670 |
927 |
1 161 |
569 |
Tambovenergo |
3,0 |
239 |
78 |
330 |
609 |
290 |
Tverenergo |
22,5 |
823 |
526 |
999 |
1 456 |
850 |
Yarenergo |
45,1 |
811 |
637 |
988 |
1 408 |
919 |
Connected capacity structure by categories of applicants in 2020 – 2024
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
% |
Начальное изменение |
1Q 2020 |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
Up to 15 kW |
-39,3 |
16,8 |
44,4 |
46,2 |
53,1 |
47,0 |
From 15 to 150 kW |
-14,9 |
10,6 |
25,1 |
20,5 |
18,6 |
27,3 |
From 150 to 670 kW |
-3,1 |
2,7 |
6,7 |
5,9 |
4,6 |
7,8 |
670 kW and above |
57,3 |
69,9 |
23,8 |
27,4 |
23,7 |
17,9 |
Connected capacity structure by categories of applicants in 1Q 2024