Hotline of power engineering specialists:
Grid Connection
1 quarter
Grid connection in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
|
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Connected capacity, MW |
-58,7 |
173,2 |
215,7 |
304,5 |
167,4 |
202,1 |
Number of concluded contracts, pcs. |
28,6 |
8 915 |
9 863 |
7 145 |
7 654 |
7 897 |
Number of connections, pcs. |
3,9 |
7 218 |
8 922 |
14 770 |
7 884 |
8 950 |
including connections up to 15 kW, pcs. |
4,8 |
6 664 |
8 350 |
13 978 |
7 309 |
8 404 |
Connected capacity broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MW |
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Belgorodenergo |
16,1 |
28,1 |
27,6 |
31,0 |
14,5 |
24,0 |
Bryanskenergo |
-44,3 |
10,2 |
4,3 |
6,2 |
6,8 |
4,2 |
Voronezhenergo |
-91,2 |
24,9 |
52,7 |
51,3 |
41,2 |
44,4 |
Kostromaenergo |
-32,4 |
9,6 |
18,2 |
17,9 |
15,5 |
12,2 |
Kurskenergo |
-49,3 |
3,4 |
12,4 |
20,8 |
15,3 |
9,5 |
Lipetskenergo |
86,9 |
11,4 |
15,6 |
82,0 |
11,9 |
19,1 |
Orelenergo |
-5,6 |
6,8 |
6,9 |
11,9 |
5,3 |
7,9 |
Smolenskenergo |
30,6 |
25,6 |
18,7 |
19,1 |
12,8 |
30,8 |
Tambovenergo |
-49,4 |
3,9 |
10,9 |
15,3 |
5,8 |
7,0 |
Tverenergo |
11,8 |
16,1 |
26,2 |
23,6 |
21,3 |
14,9 |
Yarenergo |
80,4 |
33,2 |
22,2 |
25,4 |
17,0 |
28,1 |
Number of concluded contracts broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Belgorodenergo |
33,2 |
1 528 |
1 539 |
821 |
1 074 |
976 |
Bryanskenergo |
28,6 |
283 |
344 |
324 |
289 |
300 |
Voronezhenergo |
61,7 |
1 350 |
1 592 |
1 191 |
1 280 |
1 209 |
Kostromaenergo |
-15,2 |
664 |
774 |
569 |
617 |
538 |
Kurskenergo |
50,0 |
564 |
589 |
407 |
467 |
511 |
Lipetskenergo |
31,0 |
685 |
1 004 |
875 |
852 |
958 |
Orelenergo |
-13,1 |
312 |
433 |
241 |
263 |
381 |
Smolenskenergo |
30,4 |
772 |
971 |
539 |
612 |
590 |
Tambovenergo |
-3,0 |
289 |
316 |
288 |
287 |
325 |
Tverenergo |
62,3 |
1 454 |
1 219 |
858 |
926 |
928 |
Yarenergo |
12,2 |
1 014 |
1 082 |
1 032 |
987 |
1 181 |
Number of connections broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Belgorodenergo |
29,6 |
1 392 |
1 275 |
1 748 |
1 010 |
1 065 |
Bryanskenergo |
57,9 |
371 |
345 |
487 |
356 |
343 |
Voronezhenergo |
42,8 |
1 468 |
1 279 |
2 858 |
1 416 |
1 765 |
Kostromaenergo |
-37,7 |
524 |
786 |
1 056 |
603 |
838 |
Kurskenergo |
-39,8 |
256 |
577 |
901 |
647 |
578 |
Lipetskenergo |
72,9 |
792 |
863 |
2 050 |
736 |
999 |
Orelenergo |
-10,5 |
307 |
379 |
824 |
269 |
386 |
Smolenskenergo |
40,9 |
748 |
997 |
1 219 |
630 |
471 |
Tambovenergo |
-59,6 |
110 |
353 |
642 |
322 |
387 |
Tverenergo |
-33,1 |
572 |
1 028 |
1 500 |
908 |
927 |
Yarenergo |
-23,2 |
678 |
1 040 |
1 485 |
987 |
1 191 |
Number of connections up to 15 kW broken down by Branches in 2021 – 2025
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
pcs. |
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Belgorodenergo |
33,5 |
1 242 |
1 161 |
1 604 |
937 |
976 |
Bryanskenergo |
61,2 |
345 |
337 |
470 |
338 |
323 |
Voronezhenergo |
43,7 |
1 395 |
1 195 |
2 653 |
1 316 |
1 652 |
Kostromaenergo |
-38,1 |
466 |
688 |
986 |
546 |
772 |
Kurskenergo |
-37,0 |
250 |
545 |
859 |
620 |
565 |
Lipetskenergo |
74,7 |
758 |
812 |
1 962 |
671 |
933 |
Orelenergo |
-8,3 |
297 |
368 |
810 |
253 |
373 |
Smolenskenergo |
45,7 |
670 |
927 |
1 161 |
569 |
401 |
Tambovenergo |
-67,4 |
78 |
330 |
609 |
290 |
355 |
Tverenergo |
-36,1 |
526 |
999 |
1 456 |
850 |
900 |
Yarenergo |
-21,5 |
637 |
988 |
1 408 |
919 |
1 154 |
Connected capacity structure by categories of applicants in 2021 – 2025
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
% |
Начальное изменение |
1Q 2021 |
1Q 2022 |
1Q 2023 |
1Q 2024 |
1Q 2025 |
Up to 15 kW |
27,6 |
44,4 |
46,2 |
53,1 |
47,0 |
44,7 |
From 15 to 150 kW |
14,5 |
25,1 |
20,5 |
18,6 |
27,3 |
21,0 |
From 150 to 670 kW |
4,0 |
6,7 |
5,9 |
4,6 |
7,8 |
4,6 |
670 kW and above |
-46,1 |
23,8 |
27,4 |
23,7 |
17,9 |
29,7 |
Connected capacity structure by categories of applicants in 1Q 2025