Electrical energy transmission

4 quarter

Electrical energy transmission in 2020 – 2024

Graph
Million kW*h Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
Supply to the grid -0,4 14 285,3 14 912,4 14 775,1 14 969,7 14 628,6
Productive supply1 0,2 12 765,2 13 287,9 13 030,5 13 153,1 12 924,0
Total losses -4,8 1 520,1 1 624,5 1 744,6 1 816,6 1 704,6
Total losses, % -0,50 10,64 10,89 11,81 12,14 11,65
Electricity transmission services2 -0,0 12 281,3 12 813,8 12 615,0 12 730,1 12 517,3
1 – productive supply within the joint operation (taking into account losses of TGOs)
2 – taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Supply to the grid broken down by Branches in 2020 – 2024

Graph
Million kW*h Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
Belgorodenergo -0,9 1 853,5 1 882,4 1 847,1 1 867,6 1 820,8
Bryanskenergo -2,6 965,6 1 013,1 1 015,8 1 011,7 987,8
Voronezhenergo 1,9 2 536,0 2 632,2 2 602,8 2 661,2 2 670,4
Kostromaenergo -1,0 709,6 673,2 700,6 699,0 686,7
Kurskenergo -0,5 961,7 998,5 996,5 1 019,1 941,8
Lipetskenergo 0,3 1 467,0 1 578,4 1 534,3 1 519,0 1 413,5
Orelenergo -1,1 645,0 643,8 659,1 661,5 649,0
Smolenskenergo -0,8 1 051,1 1 092,1 1 063,1 1 083,7 1 056,2
Tambovenergo 0,9 797,6 818,4 816,3 826,4 823,3
Tverenergo 1,4 1 494,7 1 604,9 1 602,1 1 652,5 1 639,8
Yarenergo -3,3 1 803,5 1 975,4 1 937,4 1 968,0 1 939,3

Electrical energy of productive supply1 broken down by Branches in 2020 – 2024

Graph
Million kW*h Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
Belgorodenergo -0,9 1 636,1 1 662,9 1 625,9 1 643,5 1 605,4
Bryanskenergo -3,9 907,2 960,9 961,4 955,3 931,2
Voronezhenergo 2,8 2 325,3 2 449,4 2 377,8 2 428,3 2 440,5
Kostromaenergo -0,9 622,8 638,5 613,9 612,1 601,1
Kurskenergo -1,6 847,3 873,2 873,1 891,6 831,5
Lipetskenergo 2,8 1 317,0 1 299,3 1 264,1 1 241,7 1 182,9
Orelenergo 0,3 583,9 580,9 593,9 589,8 586,6
Smolenskenergo 1,1 912,8 922,4 894,4 912,5 902,2
Tambovenergo -2,4 719,5 756,8 746,0 749,1 739,7
Tverenergo 2,4 1 273,5 1 386,4 1 354,8 1 396,4 1 376,6
Yarenergo -1,8 1 619,8 1 757,2 1 725,2 1 732,8 1 726,3
1 – productive supply within the boiler (including losses of TGOs)

Electrical energy of total losses broken down by Branches in 2020 – 2024

Graph
% Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
Belgorodenergo -0,01 11,72 11,66 11,97 12,00 11,83
Bryanskenergo 1,22 6,05 5,15 5,36 5,57 5,72
Voronezhenergo -0,75 8,31 6,95 8,64 8,75 8,61
Kostromaenergo -0,11 12,23 5,16 12,38 12,43 12,47
Kurskenergo 0,91 11,90 12,54 12,38 12,51 11,70
Lipetskenergo -2,18 10,23 17,68 17,61 18,25 16,32
Orelenergo -1,31 9,46 9,77 9,90 10,84 9,61
Smolenskenergo -1,63 13,16 15,54 15,87 15,80 14,58
Tambovenergo 3,01 9,79 7,52 8,61 9,36 10,15
Tverenergo -0,87 14,80 13,62 15,44 15,49 16,05
Yarenergo -1,38 10,19 11,05 10,95 11,95 10,98

Volume of electrical energy transmission services2 broken down by Branches 2020 – 2024

Graph
Million kW*h Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
Belgorodenergo -0,9 1 652,1 1 681,8 1 641,5 1 661,1 1 615,9
Bryanskenergo -3,9 897,9 950,8 952,3 945,8 923,2
Voronezhenergo 2,4 2 194,4 2 321,1 2 234,7 2 297,3 2 308,7
Kostromaenergo -1,0 617,3 635,5 608,5 606,4 595,9
Kurskenergo -2,6 801,9 831,2 842,5 858,9 802,6
Lipetskenergo 0,8 1 214,5 1 289,6 1 255,8 1 231,5 1 173,1
Orelenergo 0,0 549,3 545,4 556,1 556,7 545,4
Smolenskenergo 0,8 900,6 915,9 887,7 900,6 894,5
Tambovenergo -4,2 714,2 732,7 738,2 747,9 739,5
Tverenergo 6,0 1 206,5 1 301,2 1 271,5 1 302,8 1 290,6
Yarenergo -1,8 1 532,6 1 608,6 1 626,2 1 621,1 1 627,9
2 – taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 4Q 2020 4Q 2021 4Q 2022 4Q 2023 4Q 2024
High voltage (110 kV and above) -1,9 34,1 33,6 32,2 32,2 31,9
Medium voltage (35 kV) -0,1 4,3 4,1 3,9 4,1 4,1
Medium voltage (10-6 kV) 0,4 24,2 24,7 24,9 25,2 25,0
Low voltage (0,4 kV) -0,1 9,3 9,7 10,2 10,4 10,4
Population 1 1,7 28,1 27,9 28,8 28,1 28,6
1 – taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 4Q 2024