Site colours:
Zoom:

Electrical energy transmission

1 half

Electrical energy transmission in 2022 – 2026

Graph
Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
Supply to the grid, Million kW*h 0,6 27 424,5 27 080,4 28 122,9 27 162,1 27 720,4
Productive supply1, Million kW*h 0,2 24 611,4 24 329,0 25 300,3 24 416,8 24 857,0
Total losses, Million kW*h 4,0 2 813,0 2 751,4 2 822,6 2 745,3 2 863,4
Total losses, % 0,34 10,26 10,16 10,04 10,11 10,33
Electricity transmission services2, Million kW*h 0,8 24 054,8 23 749,7 24 743,6 23 897,8 24 342,0
1 – productive supply within the joint operation (taking into account losses of TGOs)
2 – Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2022 – 2026

Graph
Million kW*h Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
Belgorodenergo 0,1 3 501,7 3 375,0 3 534,1 3 458,9 3 485,3
Bryanskenergo 1,7 1 856,8 1 812,9 1 861,3 1 769,1 1 765,4
Voronezhenergo 1,4 4 891,1 4 821,2 5 070,2 4 992,5 5 230,6
Kostromaenergo -3,1 1 341,0 1 293,3 1 337,3 1 276,5 1 284,3
Kurskenergo 0,9 1 840,5 1 844,5 1 893,4 1 831,6 1 987,5
Lipetskenergo 0,5 2 868,2 2 846,3 2 824,0 2 549,3 2 552,8
Orelenergo 1,5 1 228,6 1 198,4 1 237,0 1 212,9 1 237,6
Smolenskenergo -0,6 2 001,9 1 980,1 2 016,7 1 983,5 2 006,3
Tambovenergo 1,6 1 504,5 1 481,5 1 555,2 1 522,5 1 570,6
Tverenergo 1,7 2 928,4 2 921,3 3 044,2 2 999,2 3 016,9
Yarenergo -0,3 3 461,8 3 505,9 3 749,5 3 566,1 3 583,1

Electrical energy of productive supply1 broken down by Branches in 2022 – 2026

Graph
Million kW*h Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
Belgorodenergo 0,4 3 167,1 3 043,5 3 174,1 3 111,2 3 101,4
Bryanskenergo 1,7 1 755,8 1 715,1 1 762,3 1 668,4 1 665,8
Voronezhenergo 1,8 4 477,1 4 432,1 4 681,4 4 574,2 4 800,7
Kostromaenergo -3,2 1 223,3 1 183,3 1 208,1 1 154,7 1 163,3
Kurskenergo 1,2 1 636,1 1 646,5 1 698,4 1 631,1 1 758,1
Lipetskenergo -4,6 2 432,4 2 428,9 2 408,3 2 173,0 2 175,4
Orelenergo 1,5 1 120,4 1 081,7 1 121,1 1 108,1 1 125,4
Smolenskenergo -0,7 1 762,2 1 742,1 1 761,2 1 751,0 1 762,7
Tambovenergo 1,6 1 374,8 1 368,0 1 422,5 1 408,2 1 451,4
Tverenergo 1,9 2 518,1 2 525,3 2 640,8 2 580,1 2 591,2
Yarenergo -0,1 3 144,1 3 162,5 3 422,1 3 256,8 3 261,6
1 – productive supply within the joint operation (taking into account losses of TGOs)

Electrical energy of total losses broken down by Branches in 2022 – 2026

Graph
% Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
Belgorodenergo -0,23 9,55 9,82 10,19 10,05 11,02
Bryanskenergo -0,05 5,44 5,40 5,32 5,69 5,64
Voronezhenergo -0,35 8,46 8,07 7,67 8,38 8,22
Kostromaenergo 0,06 8,78 8,50 9,67 9,54 9,42
Kurskenergo -0,33 11,11 10,74 10,30 10,95 11,54
Lipetskenergo 4,56 15,20 14,67 14,72 14,76 14,79
Orelenergo 0,01 8,80 9,74 9,37 8,65 9,07
Smolenskenergo 0,03 11,97 12,02 12,67 11,72 12,14
Tambovenergo 0,01 8,62 7,66 8,53 7,51 7,59
Tverenergo -0,12 14,01 13,55 13,25 13,97 14,11
Yarenergo -0,13 9,18 9,80 8,73 8,67 8,97

Volume of electrical energy transmission services2 broken down by Branches in 2022 – 2026

Graph
Million kW*h Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
Belgorodenergo 0,4 3 200,0 3 074,1 3 197,2 3 116,7 3 098,6
Bryanskenergo 1,8 1 740,8 1 702,5 1 749,3 1 642,1 1 643,7
Voronezhenergo 2,4 4 303,0 4 257,2 4 503,5 4 430,3 4 652,0
Kostromaenergo -2,8 1 219,8 1 174,7 1 199,4 1 146,4 1 154,7
Kurskenergo 1,2 1 585,1 1 597,9 1 657,2 1 562,4 1 697,1
Lipetskenergo 0,4 2 417,0 2 411,9 2 391,6 2 161,1 2 162,9
Orelenergo 0,8 1 060,9 1 027,7 1 072,1 1 064,8 1 082,6
Smolenskenergo -0,7 1 752,2 1 725,1 1 750,0 1 745,9 1 755,1
Tambovenergo 1,8 1 391,8 1 373,8 1 446,1 1 433,5 1 478,6
Tverenergo 1,3 2 390,8 2 412,1 2 533,7 2 493,0 2 489,9
Yarenergo -0,2 2 993,4 2 992,7 3 243,5 3 101,6 3 126,8
2 – taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 1H 2022 1H 2023 1H 2024 1H 2025 1H 2026
High voltage (110 kV and above) -0,9 32,7 31,9 31,8 27,8 26,4
Medium voltage (35 kV) -0,1 4,0 4,0 4,0 3,5 3,1
Medium voltage (10-6 kV) 0,3 24,3 24,5 24,4 25,8 26,2
Low voltage (0,4 kV) 0,0 9,7 10,0 10,1 10,9 11,3
Population 1 0,7 29,3 29,6 29,7 32,0 33,0
1 – taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 1H 2026