Electrical energy transmission

3 quarter

Electrical energy transmission in 2020 – 2024

Graph
Million kW*h Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
Supply to the grid -2,9 11 667,4 12 395,2 12 177,0 11 991,9 12 338,7
Productive supply1 -2,1 10 773,6 11 397,3 11 166,2 11 000,2 11 360,3
Total losses -11,9 893,8 997,9 1 010,8 991,7 978,4
Total losses, % -0,78 7,66 8,05 8,30 8,27 7,93
Electricity transmission services2 -2,1 10 570,0 11 163,4 10 949,6 10 811,9 11 173,3
1 – productive supply within the joint operation (taking into account losses of TGOs)
2 – taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2020 – 2024

Graph
Million kW*h Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
Belgorodenergo -1,5 1 623,5 1 666,3 1 627,5 1 532,0 1 636,8
Bryanskenergo -9,0 764,2 822,3 828,8 799,7 818,4
Voronezhenergo 0,1 2 107,2 2 293,4 2 239,0 2 238,3 2 400,9
Kostromaenergo -2,6 612,5 624,1 568,3 569,5 571,7
Kurskenergo -1,2 793,0 835,2 849,1 843,4 825,1
Lipetskenergo 0,5 1 168,1 1 263,8 1 267,5 1 222,9 1 201,9
Orelenergo -5,1 536,6 545,9 551,2 542,8 551,0
Smolenskenergo -4,9 834,2 866,1 856,6 862,3 861,0
Tambovenergo -3,7 658,5 688,7 692,4 679,4 707,8
Tverenergo -3,8 1 177,1 1 240,3 1 231,4 1 221,1 1 253,6
Yarenergo -6,1 1 392,5 1 549,1 1 465,2 1 480,5 1 510,5

Electrical energy of productive supply1 broken down by Branches in 2020 – 2024

Graph
Million kW*h Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
Belgorodenergo -1,2 1 508,8 1 547,0 1 507,4 1 410,5 1 511,2
Bryanskenergo -9,1 730,0 784,4 793,7 765,2 784,1
Voronezhenergo 0,5 1 973,6 2 146,2 2 093,4 2 099,5 2 249,4
Kostromaenergo -0,2 562,1 570,2 527,6 530,1 521,7
Kurskenergo -1,5 712,8 747,9 770,8 767,4 758,5
Lipetskenergo 2,0 1 090,3 1 165,9 1 105,0 1 074,6 1 070,3
Orelenergo -5,6 496,2 507,2 512,5 500,8 513,2
Smolenskenergo -3,4 744,0 778,5 766,7 778,2 778,3
Tambovenergo -3,3 615,0 629,9 638,1 622,7 655,4
Tverenergo -1,7 1 041,7 1 091,7 1 084,3 1 083,2 1 108,8
Yarenergo -4,7 1 299,1 1 428,4 1 366,7 1 368,0 1 409,4
1 – productive supply within the joint operation (taking into account losses of TGOs)

Electrical energy of total losses broken down by Branches in 2020 – 2024

Graph
% Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
Belgorodenergo -0,33 7,07 7,16 7,38 7,93 7,68
Bryanskenergo 0,21 4,48 4,61 4,23 4,31 4,20
Voronezhenergo -0,33 6,34 6,42 6,50 6,20 6,31
Kostromaenergo -2,21 8,22 8,63 7,17 6,92 8,74
Kurskenergo 0,28 10,12 10,46 9,22 9,01 8,07
Lipetskenergo -1,36 6,66 7,75 12,82 12,12 10,95
Orelenergo 0,40 7,52 7,09 7,02 7,74 6,86
Smolenskenergo -1,33 10,81 10,12 10,50 9,75 9,60
Tambovenergo -0,38 6,62 8,54 7,84 8,34 7,40
Tverenergo -1,85 11,51 11,98 11,95 11,29 11,55
Yarenergo -1,41 6,70 7,79 6,72 7,61 6,69

Volume of electrical energy transmission services2 broken down by Branches in in 2020 – 2024

Graph
Million kW*h Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
Belgorodenergo -1,2 1 524,0 1 563,5 1 522,2 1 427,0 1 521,7
Bryanskenergo -9,1 725,0 778,2 788,5 761,1 779,8
Voronezhenergo 1,2 1 910,0 2 072,9 2 008,1 2 035,8 2 180,2
Kostromaenergo -0,2 560,0 568,0 525,2 527,2 518,9
Kurskenergo -0,7 703,0 737,0 755,3 761,0 751,0
Lipetskenergo 0,6 1 049,0 1 116,8 1 099,5 1 070,8 1 064,6
Orelenergo -5,4 477,0 484,2 487,9 476,4 492,6
Smolenskenergo -4,9 739,0 776,6 763,5 773,2 775,4
Tambovenergo -4,3 625,0 644,1 648,4 639,0 673,3
Tverenergo -1,2 1 015,0 1 058,7 1 048,4 1 052,4 1 078,6
Yarenergo -4,0 1 243,0 1 363,4 1 302,6 1 288,0 1 337,2
2 – taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 3Q 2020 3Q 2021 3Q 2022 3Q 2023 3Q 2024
High voltage (110 kV and above) -1,9 34,4 34,0 33,3 33,2 32,6
Medium voltage (35 kV) -0,1 4,3 4,1 4,1 4,1 4,0
Medium voltage (10-6 kV) 0,3 23,9 24,3 24,7 25,1 25,4
Low voltage (0,4 kV) -0,2 9,1 9,0 9,2 9,3 9,6
Population 1 1,9 28,3 27,9 28,7 28,3 28,4
1 – taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 3Q 2024