* – the change is calculated on the basis of the indicators presented in the table and rounded to the nearest tenth
Million kW*h
Начальное изменение
9M 2021
9M 2022
9M 2023
9M 2024
9M 2025
Supply to the grid
5,5
39 658,6
39 601,5
39 072,3
40 461,6
39 421,1
Productive supply1
5,7
35 956,5
35 777,6
35 329,2
36 660,7
35 571,8
Total losses
3,3
3 702,1
3 823,9
3 743,1
3 800,9
3 849,3
Total losses, %
-0,20
9,33
9,66
9,58
9,39
9,76
Electricity transmission services2
5,5
35 032,9
35 004,4
34 561,5
35 916,8
34 843,5
1 – productive supply within the joint operation (taking into account losses of TGOs) 2 – taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)
Electrical energy supply to the grid broken down by Branches in 2021 – 2025
* – the change is calculated on rounded to the first decimal place in the table
Million kW*h
Начальное изменение
9M 2021
9M 2022
9M 2023
9M 2024
9M 2025
Belgorodenergo
1,3
4 749,7
4 722,2
4 501,1
4 718,9
4 579,1
Bryanskenergo
4,9
2 488,3
2 529,3
2 463,6
2 529,1
2 369,6
Voronezhenergo
7,0
6 273,9
6 311,1
6 293,0
6 683,8
6 540,3
Kostromaenergo
9,0
1 822,6
1 745,0
1 701,9
1 718,3
1 658,5
Kurskenergo
4,6
2 303,9
2 340,4
2 358,9
2 408,3
2 307,5
Lipetskenergo
5,7
3 525,1
3 516,5
3 482,6
3 456,2
3 173,3
Orelenergo
1,9
1 536,4
1 548,8
1 504,0
1 564,8
1 555,6
Smolenskenergo
8,2
2 541,4
2 515,7
2 498,3
2 525,4
2 522,3
Tambovenergo
0,8
2 010,7
2 040,2
2 012,8
2 119,4
2 109,5
Tverenergo
7,6
3 419,4
3 439,2
3 464,5
3 612,3
3 567,6
Yarenergo
8,3
4 361,5
4 296,0
4 280,8
4 580,3
4 460,2
2 – taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels (volume of electricity transmission services)
1 – taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels for 9M 2025