Productive potential

Productive potential indicators1 in 2020 – 2024

Graph
Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Length of power lines (along ROW), km: 0,5 396 632 397 169 401 115 403 404 406 011
– Length of 35-110 kV Conductors (along ROW) 0,1 51 308 51 286 51 384 51 404 51 451
– Length of 0.4-10 kV Conductors (along ROW) 0,5 324 436 325 255 326 537 327 983 330 016
– Length of 0.4-110 kV Cables 1,4 20 888 20 628 23 194 24 017 24 544
Capacity of Substations, MVA: 0,8 54 620 55 022 56 004 56 519 57 165
– Capacity of 35-110 kV Substations 0,6 34 629 34 825 34 964 35 167 35 475
– Capacity of 6-10/0.4 kV Transformer and Distribution Substations 1,1 19 991 20 197 21 041 21 352 21 690
Number of Substations, pcs: 1,0 103 971 104 673 106 042 107 061 108 239
– Number of 35-110 kV Substations 0,0 2 377 2 379 2 386 2 389 2 397
– Number of 6-10/0.4 kV Transformer and Distribution Substations 1,1 101 594 102 294 103 656 104 672 105 842
Number of c.u. 4,9 2 503 178 2 624 445 2 767 310 2 819 178 2 898 003
Number of Distribution Zones, pcs -7,2 257 217 217 217 219
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 35-110 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024

Graph
km Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo -0,4 4 287 4 272 4 303 4 308 4 317
Bryanskenergo 0,0 3 553 3 554 3 554 3 554 3 555
Voronezhenergo -0,2 6 794 6 793 6 783 6 778 6 778
Kostromaenergo 0,0 4 184 4 184 4 188 4 189 4 194
Kurskenergo 1,0 4 684 4 681 4 673 4 688 4 703
Lipetskenergo 0,5 3 824 3 809 3 819 3 820 3 821
Orelenergo 0,1 3 080 3 083 3 141 3 142 3 142
Smolenskenergo 0,4 6 055 6 056 6 057 6 059 6 074
Tambovenergo 0,0 4 879 4 886 4 886 4 886 4 887
Tverenergo 0,0 6 841 6 840 6 844 6 844 6 846
Yarenergo 0,0 3 127 3 127 3 137 3 136 3 137
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-10 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024

Graph
km Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 0,6 37 576 37 704 37 791 38 113 38 391
Bryanskenergo 0,5 22 353 22 555 22 585 22 683 22 917
Voronezhenergo 0,9 44 168 44 292 44 498 44 684 45 204
Kostromaenergo 0,8 18 220 18 239 18 311 18 354 18 409
Kurskenergo 0,5 29 457 29 464 29 503 29 672 29 817
Lipetskenergo 0,5 24 976 25 074 26 253 26 407 26 709
Orelenergo -0,5 23 228 23 190 23 221 23 251 23 290
Smolenskenergo 0,9 33 232 33 408 33 561 33 885 34 070
Tambovenergo 0,5 22 723 22 782 22 360 22 383 22 626
Tverenergo 0,1 42 086 42 058 41 889 42 005 42 016
Yarenergo 0,6 26 418 26 488 26 566 26 545 26 566
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-110 kV1 Cables broken down by Branches in 2020 – 2024

Graph
km Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo -0,3 10 082 9 685 9 640 10 029 10 222
Bryanskenergo 18,1 173 180 193 285 330
Voronezhenergo 3,0 400 420 460 482 534
Kostromaenergo 2,5 1 699 1 711 1 754 1 758 1 770
Kurskenergo 2,9 305 308 321 339 344
Lipetskenergo 1,7 1 249 1 295 3 678 3 820 3 855
Orelenergo 31,5 184 170 170 178 182
Smolenskenergo 2,5 2 247 2 306 2 333 2 472 2 585
Tambovenergo 2,7 331 288 285 294 321
Tverenergo 4,6 971 987 1 019 1 010 1 044
Yarenergo 1,8 3 247 3 280 3 342 3 351 3 356
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 35-110 kV1 Substations broken down by Branches in 2020 – 2024

Graph
MVA Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 1,0 3 627 3 631 3 627 3 574 3 560
Bryanskenergo 2,1 2 489 2 607 2 606 2 640 2 658
Voronezhenergo 0,2 4 998 5 063 5 137 5 150 5 170
Kostromaenergo 0,0 1 780 1 774 1 774 1 773 1 774
Kurskenergo 3,2 3 593 3 593 3 594 3 657 3 657
Lipetskenergo -1,1 3 006 3 006 3 136 3 138 3 106
Orelenergo -0,1 1 908 1 910 1 894 1 945 1 945
Smolenskenergo 1,8 3 164 3 170 3 170 3 270 3 550
Tambovenergo 0,0 2 591 2 597 2 597 2 597 2 609
Tverenergo -1,2 4 211 4 211 4 164 4 205 4 225
Yarenergo 0,6 3 263 3 263 3 264 3 219 3 221
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 35-110 kV1 Substations broken down by Branches in 2020 – 2024

Graph
pcs. Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 0,6 182 182 182 184 186
Bryanskenergo 0,0 143 145 145 146 147
Voronezhenergo 0,3 296 297 299 300 301
Kostromaenergo 0,0 165 165 165 165 165
Kurskenergo 0,4 286 286 286 288 288
Lipetskenergo -0,5 200 200 206 206 205
Orelenergo -1,4 147 145 145 146 146
Smolenskenergo 0,4 254 254 254 256 260
Tambovenergo 0,0 221 221 221 221 222
Tverenergo -0,3 313 312 311 312 312
Yarenergo 0,0 172 172 172 165 165
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024

Graph
MVA Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 1,1 4 296 4 335 4 388 4 425 4 450
Bryanskenergo 4,8 812 827 832 868 891
Voronezhenergo 1,2 1 858 1 888 1 923 1 974 2 027
Kostromaenergo 0,3 1 550 1 541 1 536 1 536 1 544
Kurskenergo 0,4 1 666 1 667 1 657 1 677 1 739
Lipetskenergo 0,9 1 711 1 727 2 458 2 509 2 550
Orelenergo 0,5 922 931 927 927 913
Smolenskenergo 0,6 1 949 1 993 2 010 2 081 2 148
Tambovenergo 0,7 1 174 1 170 1 168 1 175 1 201
Tverenergo 1,0 1 967 1 985 1 988 2 011 2 025
Yarenergo 2,2 2 088 2 134 2 154 2 172 2 203
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024

Graph
pcs. Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 1,0 13 675 13 808 13 926 14 073 14 205
Bryanskenergo 0,5 5 983 5 998 6 052 6 091 6 230
Voronezhenergo 2,0 12 281 12 426 12 561 12 771 13 021
Kostromaenergo 0,7 6 533 6 509 6 487 6 486 6 529
Kurskenergo 1,0 9 485 9 553 9 540 9 673 9 806
Lipetskenergo 0,8 9 389 9 464 10 458 10 584 10 732
Orelenergo -0,4 5 874 5 874 5 788 5 808 5 810
Smolenskenergo 1,3 9 840 9 939 10 044 10 182 10 327
Tambovenergo 1,3 6 420 6 466 6 501 6 596 6 703
Tverenergo 0,6 12 622 12 700 12 716 12 828 12 855
Yarenergo 2,1 9 492 9 557 9 583 9 580 9 624
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of c.u.1 broken down by Branches in 2020 – 2024

Graph
c.u. Начальное изменение 1H 2020 1H 2021 1H 2022 1H 2023 1H 2024
Belgorodenergo 3,9 373 160 386 048 397 805 405 620 414 284
Bryanskenergo 29,4 176 100 185 823 188 883 191 379 193 336
Voronezhenergo 8,8 303 954 318 958 320 954 327 531 332 630
Kostromaenergo 4,3 168 192 177 802 180 079 183 343 188 026
Kurskenergo 1,1 208 838 217 375 223 831 230 603 232 886
Lipetskenergo 0,9 186 562 194 701 225 295 228 238 230 695
Orelenergo 3,1 145 576 157 965 158 045 159 773 160 787
Smolenskenergo 3,8 301 734 310 227 327 918 334 009 339 776
Tambovenergo 1,1 147 196 148 881 174 630 179 193 187 404
Tverenergo 1,4 245 050 267 167 301 709 308 896 320 743
Yarenergo 2,8 246 817 259 497 268 160 270 593 297 437
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Level of physical deterioration of equipment1 in 2023 – 2024

Graph
Name of equipment Начальное изменение 30.06.2023 30.09.2023 31.12.2023 31.03.2024 30.06.2024
Conductors 0.4-20 kV, % none 73,4 74,0 74,1 74,3 73,3
Conductors 35-110 kV, % none 84,7 85,3 85,4 85,6 85,7
Conductors 0.4-110 kV, % none 76,3 76,8 77,0 77,2 76,8
Cables 0.4-20 kV, % none 68,5 69,3 69,5 69,8 70,1
Cables 35-110 kV, % none 40,6 43,4 39,2 40,2 39,2
Cables 0.4-110 kV, % none 63,5 64,4 63,8 64,2 64,5
Power lines 35-110 kV, % none 78,5 78,9 78,5 78,8 78,8
Power lines 3-20 kV, % none 73,8 74,5 74,6 74,8 73,9
Power lines 0.4 kV, % none 71,3 72,1 72,3 72,5 69,9
Transformer equipment 35-110 kV, % none 86,7 87,4 87,6 87,8 88,0
Transformer equipment 3-110 kV, % none 83,0 83,6 83,7 84,0 84,1
Switching devices 35-110 kV, % none 76,7 77,8 78,1 78,3 78,6
Switching devices 3-110 kV, % none 74,4 75,6 75,8 76,1 76,4
Substation equipment 35-110 kV, % none 81,0 82,0 82,2 82,4 82,7
Substation equipment 3-110 kV, % none 79,4 80,3 80,5 80,8 81,0
Total wear of Rosseti Centre, % none 75,8 76,6 76,6 76,9 76,7
1 – data presented with taking into account own and leased property, as well as property serviced under contracts