Productive potential indicators1 in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
|
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Length of power lines (along ROW), km: |
0,4 |
396 732 |
397 364 |
401 332 |
403 970 |
406 438 |
– Length of 35-110 kV Conductors (along ROW) |
0,0 |
51 313 |
51 339 |
51 386 |
51 381 |
51 453 |
– Length of 0.4-10 kV Conductors (along ROW) |
0,4 |
324 574 |
325 423 |
326 646 |
328 395 |
330 358 |
– Length of 0.4-110 kV Cables |
1,1 |
20 845 |
20 602 |
23 301 |
24 194 |
24 627 |
Capacity of Substations, MVA: |
0,9 |
54 732 |
55 063 |
56 031 |
56 553 |
57 122 |
– Capacity of 35-110 kV Substations |
0,9 |
34 721 |
34 854 |
34 998 |
35 125 |
35 362 |
– Capacity of 6-10/0.4 kV Transformer and Distribution Substations |
0,9 |
20 011 |
20 209 |
21 033 |
21 428 |
21 760 |
Number of Substations, pcs: |
0,8 |
104 071 |
104 739 |
106 059 |
107 429 |
108 519 |
– Number of 35-110 kV Substations |
0,0 |
2 378 |
2 380 |
2 381 |
2 390 |
2 397 |
– Number of 6-10/0.4 kV Transformer and Distribution Substations |
0,8 |
101 693 |
102 359 |
103 678 |
105 039 |
106 122 |
Number of c.u. |
4,6 |
2 533 651 |
2 650 963 |
2 778 486 |
2 852 823 |
2 917 495 |
Number of Distribution Zones, pcs |
-7,7 |
253 |
217 |
218 |
218 |
219 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Length of 35-110 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Km |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
-0,1 |
4 300 |
4 272 |
4 303 |
4 304 |
4 316 |
Bryanskenergo |
0,0 |
3 553 |
3 554 |
3 554 |
3 554 |
3 554 |
Voronezhenergo |
-0,2 |
6 793 |
6 793 |
6 780 |
6 778 |
6 778 |
Kostromaenergo |
0,0 |
4 184 |
4 184 |
4 189 |
4 189 |
4 195 |
Kurskenergo |
0,8 |
4 681 |
4 681 |
4 673 |
4 666 |
4 706 |
Lipetskenergo |
0,4 |
3 826 |
3 809 |
3 822 |
3 821 |
3 820 |
Orelenergo |
-0,2 |
3 080 |
3 125 |
3 142 |
3 142 |
3 142 |
Smolenskenergo |
-0,1 |
6 048 |
6 056 |
6 057 |
6 059 |
6 073 |
Tambovenergo |
0,0 |
4 879 |
4 886 |
4 886 |
4 887 |
4 887 |
Tverenergo |
0,0 |
6 841 |
6 844 |
6 844 |
6 845 |
6 846 |
Yarenergo |
0,0 |
3 127 |
3 135 |
3 137 |
3 137 |
3 137 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Length of 0.4-10 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Km |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
0,7 |
37 611 |
37 721 |
37 827 |
38 194 |
38 453 |
Bryanskenergo |
0,4 |
22 352 |
22 566 |
22 605 |
22 861 |
22 928 |
Voronezhenergo |
0,7 |
44 226 |
44 338 |
44 529 |
44 726 |
45 241 |
Kostromaenergo |
0,6 |
18 224 |
18 258 |
18 314 |
18 371 |
18 428 |
Kurskenergo |
0,4 |
29 458 |
29 473 |
29 483 |
29 695 |
29 882 |
Lipetskenergo |
0,4 |
25 012 |
25 094 |
26 275 |
26 462 |
26 773 |
Orelenergo |
-0,1 |
23 247 |
23 183 |
23 219 |
23 265 |
23 296 |
Smolenskenergo |
0,3 |
33 181 |
33 456 |
33 602 |
33 907 |
34 132 |
Tambovenergo |
0,3 |
22 743 |
22 769 |
22 367 |
22 412 |
22 637 |
Tverenergo |
0,1 |
42 088 |
42 062 |
41 832 |
41 976 |
42 000 |
Yarenergo |
0,6 |
26 432 |
26 503 |
26 594 |
26 527 |
26 586 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Length of 0.4-110 kV1 Cables broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Km |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
-0,6 |
10 014 |
9 617 |
9 680 |
10 095 |
10 259 |
Bryanskenergo |
17,2 |
171 |
180 |
194 |
331 |
331 |
Voronezhenergo |
1,1 |
405 |
426 |
462 |
486 |
540 |
Kostromaenergo |
2,0 |
1 700 |
1 713 |
1 757 |
1 763 |
1 781 |
Kurskenergo |
2,8 |
306 |
308 |
322 |
339 |
344 |
Lipetskenergo |
1,5 |
1 254 |
1 298 |
3 725 |
3 824 |
3 875 |
Orelenergo |
32,3 |
185 |
178 |
176 |
179 |
182 |
Smolenskenergo |
1,9 |
2 250 |
2 316 |
2 338 |
2 492 |
2 588 |
Tambovenergo |
3,0 |
332 |
290 |
286 |
319 |
321 |
Tverenergo |
4,6 |
973 |
990 |
1 016 |
1 018 |
1 045 |
Yarenergo |
1,7 |
3 255 |
3 286 |
3 345 |
3 349 |
3 361 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Capacity of 35-110 kV1 Substations broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MVA |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
0,6 |
3 617 |
3 631 |
3 712 |
3 546 |
3 444 |
Bryanskenergo |
2,0 |
2 489 |
2 607 |
2 606 |
2 624 |
2 648 |
Voronezhenergo |
1,7 |
5 078 |
5 075 |
5 137 |
5 150 |
5 170 |
Kostromaenergo |
0,0 |
1 780 |
1 774 |
1 773 |
1 774 |
1 774 |
Kurskenergo |
3,6 |
3 601 |
3 594 |
3 594 |
3 657 |
3 665 |
Lipetskenergo |
-1,1 |
3 006 |
3 006 |
3 136 |
3 138 |
3 109 |
Orelenergo |
-0,1 |
1 910 |
1 926 |
1 895 |
1 945 |
1 947 |
Smolenskenergo |
1,8 |
3 170 |
3 170 |
3 170 |
3 270 |
3 550 |
Tambovenergo |
0,2 |
2 597 |
2 597 |
2 597 |
2 597 |
2 629 |
Tverenergo |
0,0 |
4 211 |
4 211 |
4 164 |
4 205 |
4 205 |
Yarenergo |
0,5 |
3 263 |
3 263 |
3 214 |
3 219 |
3 221 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Number of 35-110 kV1 Substations broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Pcs |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
0,6 |
182 |
182 |
184 |
185 |
186 |
Bryanskenergo |
0,0 |
143 |
145 |
145 |
146 |
147 |
Voronezhenergo |
0,3 |
297 |
297 |
299 |
300 |
301 |
Kostromaenergo |
0,0 |
165 |
165 |
165 |
165 |
165 |
Kurskenergo |
0,4 |
286 |
286 |
286 |
288 |
288 |
Lipetskenergo |
-0,5 |
200 |
200 |
206 |
206 |
205 |
Orelenergo |
-1,4 |
145 |
146 |
145 |
146 |
146 |
Smolenskenergo |
0,4 |
254 |
254 |
254 |
256 |
260 |
Tambovenergo |
0,0 |
221 |
221 |
221 |
221 |
222 |
Tverenergo |
-0,3 |
313 |
312 |
311 |
312 |
312 |
Yarenergo |
0,0 |
172 |
172 |
165 |
165 |
165 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Capacity of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
MVA |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
1,0 |
4 303 |
4 339 |
4 379 |
4 436 |
4 467 |
Bryanskenergo |
4,5 |
811 |
828 |
833 |
898 |
892 |
Voronezhenergo |
1,1 |
1 870 |
1 896 |
1 932 |
1 982 |
2 032 |
Kostromaenergo |
0,0 |
1 544 |
1 537 |
1 533 |
1 535 |
1 552 |
Kurskenergo |
0,1 |
1 655 |
1 656 |
1 645 |
1 669 |
1 723 |
Lipetskenergo |
0,2 |
1 712 |
1 728 |
2 462 |
2 515 |
2 593 |
Orelenergo |
0,2 |
925 |
923 |
920 |
928 |
916 |
Smolenskenergo |
0,4 |
1 947 |
2 000 |
2 014 |
2 088 |
2 152 |
Tambovenergo |
0,5 |
1 176 |
1 180 |
1 167 |
1 186 |
1 204 |
Tverenergo |
1,0 |
1 971 |
1 987 |
1 985 |
2 015 |
2 022 |
Yarenergo |
2,2 |
2 097 |
2 136 |
2 162 |
2 176 |
2 208 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Number of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
Pcs. |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
1,0 |
13 711 |
13 830 |
13 934 |
14 119 |
14 251 |
Bryanskenergo |
-0,2 |
5 949 |
6 005 |
6 063 |
6 188 |
6 244 |
Voronezhenergo |
2,0 |
12 339 |
12 447 |
12 596 |
12 832 |
13 065 |
Kostromaenergo |
0,3 |
6 517 |
6 497 |
6 479 |
6 500 |
6 556 |
Kurskenergo |
1,1 |
9 507 |
9 549 |
9 537 |
9 695 |
9 819 |
Lipetskenergo |
0,3 |
9 405 |
9 473 |
10 470 |
10 621 |
10 757 |
Orelenergo |
-0,6 |
5 868 |
5 817 |
5 754 |
5 817 |
5 831 |
Smolenskenergo |
0,2 |
9 805 |
9 977 |
10 055 |
10 205 |
10 340 |
Tambovenergo |
1,2 |
6 437 |
6 487 |
6 507 |
6 632 |
6 716 |
Tverenergo |
0,7 |
12 645 |
12 707 |
12 708 |
12 831 |
12 844 |
Yarenergo |
1,8 |
9 510 |
9 570 |
9 575 |
9 599 |
9 699 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Number of c.u.1 broken down by Branches in 2020 – 2024
Graph
Change*, %
* – change calculated with the rounded to the first decimal figures reflected in the table
c.u. |
Начальное изменение |
9M 2020 |
9M 2021 |
9M 2022 |
9M 2023 |
9M 2024 |
Belgorodenergo |
4,4 |
378 028 |
390 762 |
400 108 |
408 710 |
415 939 |
Bryanskenergo |
8,1 |
176 713 |
185 863 |
189 127 |
192 325 |
193 524 |
Voronezhenergo |
9,3 |
306 017 |
319 251 |
324 326 |
327 874 |
344 961 |
Kostromaenergo |
4,1 |
168 207 |
177 934 |
180 233 |
183 758 |
188 372 |
Kurskenergo |
1,1 |
208 909 |
219 845 |
226 288 |
231 334 |
233 065 |
Lipetskenergo |
1,8 |
187 630 |
194 744 |
225 843 |
228 855 |
232 672 |
Orelenergo |
7,0 |
151 186 |
158 064 |
157 718 |
160 057 |
160 918 |
Smolenskenergo |
3,3 |
304 242 |
312 017 |
328 146 |
334 216 |
340 061 |
Tambovenergo |
1,6 |
148 074 |
149 134 |
174 745 |
179 731 |
187 330 |
Tverenergo |
6,0 |
255 835 |
282 572 |
302 457 |
310 260 |
322 935 |
Yarenergo |
3,5 |
248 811 |
260 776 |
269 495 |
295 704 |
297 720 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts
Level of physical deterioration of equipment1 in 2023 – 2024
Graph
Change*, %
* – the change is calculated on rounded to the first decimal place in the table
Name of equipment |
Начальное изменение |
30.09.2023 |
31.12.2023 |
31.03.2024 |
30.06.2024 |
30.09.2024 |
Conductors 0.4-20 kV |
none |
74,0 |
74,1 |
74,3 |
73,3 |
73,4 |
Conductors 35-110 kV |
none |
85,3 |
85,4 |
85,6 |
85,7 |
85,9 |
Conductors 0.4-110 kV |
none |
76,8 |
77,0 |
77,2 |
76,8 |
76,9 |
Cables 0.4-20 kV |
none |
69,3 |
69,5 |
69,8 |
70,1 |
70,3 |
Cables 35-110 kV |
none |
43,4 |
39,2 |
40,2 |
39,2 |
39,5 |
Cables 0.4-110 kV |
none |
64,4 |
63,8 |
64,2 |
64,5 |
64,6 |
Power lines 35-110 kV |
none |
78,9 |
78,5 |
78,8 |
78,8 |
78,7 |
Power lines 3-20 kV |
none |
74,4 |
74,6 |
74,8 |
73,9 |
74,0 |
Power lines 0.4 kV |
none |
72,1 |
72,3 |
72,5 |
69,9 |
70,1 |
Transformer equipment 35-110 kV |
none |
87,4 |
87,6 |
87,8 |
88,0 |
88,2 |
Transformer equipment 3-110 kV |
none |
83,6 |
83,7 |
84,0 |
84,1 |
84,3 |
Switching devices 35-110 kV |
none |
77,8 |
78,1 |
78,3 |
78,6 |
78,9 |
Switching devices 3-110 kV |
none |
75,6 |
75,8 |
76,1 |
76,4 |
76,6 |
Substation equipment 35-110 kV |
none |
82,0 |
82,2 |
82,4 |
82,7 |
82,9 |
Substation equipment 3-110 kV |
none |
80,3 |
80,5 |
80,8 |
81,0 |
81,2 |
Total wear of Rosseti Centre |
none |
76,6 |
76,6 |
76,9 |
76,7 |
76,8 |
1 – data presented with taking into account own and leased property, as well as property serviced under contracts