Productive potential indicators1 in 2020 – 2024

Graph
Начальное изменение 2020 2021 2022 2023 2024
Length of power lines (along ROW), km: 0,4 397 117 400 738 402 019 404 551 407 256
– Length of 35-110 kV Conductors (along ROW) 0,0 51 284 51 337 51 391 51 410 51 445
– Length of 0.4-10 kV Conductors (along ROW) 0,4 324 968 326 319 326 993 328 810 330 917
– Length of 0.4-110 kV Cables 0,8 20 866 23 082 23 634 24 332 24 894
Capacity of Substations, MVA: 0,4 54 860 55 929 56 201 56 589 57 337
– Capacity of 35-110 kV Substations 0,6 34 747 34 941 35 063 35 102 35 423
– Capacity of 6-10/0.4 kV Transformer and Distribution Substations 0,2 20 113 20 988 21 138 21 487 21 914
Number of Substations, pcs: 0,7 104 425 105 915 106 319 107 692 108 973
– Number of 35-110 kV Substations 0,0 2 378 2 385 2 383 2 389 2 400
– Number of 6-10/0.4 kV Transformer and Distribution Substations 0,7 102 047 103 530 103 936 105 303 106 573
Number of c.u. 5,0 2 582 518 2 741 901 2 793 631 2 878 789 2 937 726
Number of Distribution Zones, pcs 0,0 257 217 218 219 219
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 35-110 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024

Graph
Km Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo -0,2 4 278 4 270 4 303 4 306 4 299
Bryanskenergo 0,0 3 553 3 554 3 554 3 554 3 554
Voronezhenergo -0,2 6 793 6 784 6 778 6 778 6 778
Kostromaenergo 0,0 4 184 4 184 4 189 4 191 4 197
Kurskenergo 0,3 4 681 4 681 4 682 4 689 4 704
Lipetskenergo -0,3 3 811 3 816 3 823 3 821 3 820
Orelenergo -0,2 3 080 3 126 3 141 3 142 3 142
Smolenskenergo 0,1 6 055 6 056 6 056 6 060 6 073
Tambovenergo 0,0 4 879 4 886 4 886 4 887 4 884
Tverenergo 0,0 6 841 6 844 6 844 6 846 6 858
Yarenergo 0,0 3 127 3 135 3 137 3 137 3 137
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-10 kV Conductors (along ROW)1 broken down by Branches in 2020 – 2024

Graph
Km Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo 0,5 37 645 37 764 37 915 38 301 38 500
Bryanskenergo 0,9 22 487 22 579 22 634 22 866 23 134
Voronezhenergo 0,8 44 270 44 418 44 575 44 776 45 302
Kostromaenergo 0,5 18 234 18 285 18 333 18 387 18 445
Kurskenergo 0,3 29 476 29 481 29 581 29 704 29 895
Lipetskenergo 0,4 25 034 26 223 26 314 26 553 26 855
Orelenergo -0,5 23 200 23 173 23 225 23 282 23 326
Smolenskenergo 0,4 33 307 33 495 33 697 33 949 34 186
Tambovenergo 0,3 22 760 22 360 22 373 22 461 22 640
Tverenergo 0,1 42 094 42 034 41 757 42 020 41 987
Yarenergo 0,6 26 459 26 508 26 591 26 510 26 647
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-110 kV1 Cables broken down by Branches in 2020 – 2024

Graph
Km Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo -0,9 10 002 9 664 9 929 10 165 10 294
Bryanskenergo 21,5 179 181 222 331 444
Voronezhenergo 0,8 405 446 478 488 542
Kostromaenergo 1,2 1 704 1 744 1 753 1 766 1 787
Kurskenergo 3,3 308 318 320 344 346
Lipetskenergo 3,0 1 274 3 637 3 765 3 860 3 922
Orelenergo 14,1 166 182 177 180 185
Smolenskenergo 2,0 2 259 2 320 2 341 2 501 2 602
Tambovenergo 0,4 324 297 287 319 330
Tverenergo 3,4 977 1 000 1 017 1 029 1 049
Yarenergo 2,0 3 267 3 292 3 347 3 348 3 394
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 35-110 kV1 Substations broken down by Branches in 2020 – 2024

Graph
MVA Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo 0,6 3 617 3 627 3 713 3 555 3 464
Bryanskenergo 1,6 2 489 2 606 2 606 2 624 2 648
Voronezhenergo 1,4 5 063 5 087 5 150 5 150 5 201
Kostromaenergo 0,0 1 780 1 774 1 773 1 774 1 776
Kurskenergo -0,3 3 593 3 594 3 653 3 657 3 655
Lipetskenergo 0,0 3 038 3 100 3 138 3 106 3 109
Orelenergo 0,1 1 910 1 926 1 895 1 945 1 943
Smolenskenergo 1,8 3 170 3 170 3 170 3 270 3 550
Tambovenergo 0,2 2 597 2 597 2 597 2 597 2 629
Tverenergo 0,0 4 211 4 196 4 148 4 205 4 207
Yarenergo 0,6 3 279 3 264 3 220 3 219 3 241
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 35-110 kV1 Substations broken down by Branches in 2020 – 2024

Graph
Pcs Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo 0,6 182 182 184 185 186
Bryanskenergo 0,0 143 145 145 146 147
Voronezhenergo 0,3 297 298 300 300 302
Kostromaenergo 0,0 165 165 165 165 166
Kurskenergo 0,0 286 286 288 288 288
Lipetskenergo 0,0 201 204 206 205 205
Orelenergo -1,4 145 146 145 146 146
Smolenskenergo 0,4 254 254 254 256 260
Tambovenergo 0,0 221 221 221 221 222
Tverenergo -0,3 312 312 310 312 312
Yarenergo 0,0 172 172 165 165 166
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024

Graph
MVA Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo -3,0 4 322 4 346 4 396 4 448 4 480
Bryanskenergo 3,6 818 829 838 899 946
Voronezhenergo 1,6 1 887 1 902 1 963 1 989 2 039
Kostromaenergo -0,3 1 544 1 534 1 533 1 537 1 557
Kurskenergo 0,1 1 661 1 665 1 669 1 681 1 728
Lipetskenergo 0,3 1 719 2 458 2 476 2 529 2 602
Orelenergo 1,1 926 917 930 918 917
Smolenskenergo 1,3 1 971 2 005 2 017 2 091 2 163
Tambovenergo 0,6 1 179 1 189 1 167 1 197 1 220
Tverenergo 1,0 1 973 1 988 1 986 2 016 2 029
Yarenergo 2,7 2 114 2 155 2 164 2 182 2 235
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2020 – 2024

Graph
Pcs. Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo -0,1 13 757 13 889 13 987 14 148 14 296
Bryanskenergo -0,1 5 968 6 014 6 060 6 197 6 378
Voronezhenergo 2,2 12 411 12 518 12 644 12 933 13 124
Kostromaenergo 0,1 6 517 6 487 6 480 6 502 6 569
Kurskenergo 0,9 9 529 9 545 9 589 9 747 9 840
Lipetskenergo 0,4 9 431 10 469 10 498 10 669 10 790
Orelenergo -0,2 5 876 5 786 5 788 5 766 5 842
Smolenskenergo 0,9 9 902 10 005 10 080 10 223 10 362
Tambovenergo 1,0 6 456 6 515 6 524 6 662 6 753
Tverenergo 0,7 12 673 12 717 12 708 12 839 12 863
Yarenergo 1,5 9 527 9 585 9 578 9 617 9 756
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of c.u.1 broken down by Branches in 2020 – 2024

Graph
C.u. Начальное изменение 2020 2021 2022 2023 2024
Belgorodenergo 3,8 381 168 395 735 402 858 410 023 417 922
Bryanskenergo 6,7 177 411 186 915 189 633 192 518 196 537
Voronezhenergo 5,3 306 566 320 390 326 332 331 037 346 440
Kostromaenergo 6,9 176 889 181 901 182 753 188 177 188 735
Kurskenergo 4,1 216 417 222 953 227 389 231 552 233 437
Lipetskenergo 4,0 193 798 221 293 225 978 230 588 236 955
Orelenergo 3,8 150 764 157 985 159 370 160 092 161 019
Smolenskenergo 2,9 309 467 312 165 331 204 334 459 340 397
Tambovenergo 1,0 148 428 174 008 174 884 185 272 187 732
Tverenergo 9,6 264 611 301 022 303 457 319 035 328 310
Yarenergo 6,9 256 999 267 532 269 773 296 036 300 242
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Level of physical deterioration of equipment1 in 2023 – 2024

Graph
Name of equipment Начальное изменение 31.12.2023 31.03.2024 30.06.2024 30.09.2024 31.12.2024
Conductors 0.4-20 kV 0,2 74,1 74,3 73,3 73,4 73,9
Conductors 35-110 kV 0,2 85,4 85,6 85,7 85,9 86,0
Conductors 0.4-110 kV 0,2 77,0 77,2 76,8 76,9 77,6
Cables 0.4-20 kV 0,3 69,5 69,8 70,1 70,3 69,7
Cables 35-110 kV -4,2 39,2 40,2 39,2 39,5 36,6
Cables 0.4-110 kV -0,7 63,8 64,2 64,5 64,6 63,4
Power lines 35-110 kV -0,4 78,5 78,8 78,8 78,7 78,6
Power lines 3-20 kV 0,2 74,6 74,8 73,9 74,0 74,1
Power lines 0.4 kV 0,2 72,3 72,5 69,9 70,1 69,9
Transformer equipment 35-110 kV 0,1 87,6 87,8 88,0 88,2 88,2
Transformer equipment 3-110 kV 0,2 83,7 84,0 84,1 84,3 84,3
Switching devices 35-110 kV 0,3 78,1 78,3 78,6 78,9 79,2
Switching devices 3-110 kV 0,2 75,8 76,1 76,4 76,6 76,8
Substation equipment 35-110 kV 0,2 82,2 82,4 82,7 82,9 83,0
Substation equipment 3-110 kV 0,2 80,5 80,8 81,0 81,2 81,3
Total wear of Rosseti Centre 0,1 76,6 76,9 76,7 76,8 77,2
1 – data presented with taking into account own and leased property, as well as property serviced under contracts