Site colours:
Zoom:

Productive potential

Productive potential

Productive potential indicators1 in 2019 – 2023

Graph
Начальное изменение 2019 2020 2021 2022 2023
Length of power lines (along ROW), km: 0,7 395 627 397 117 400 738 402 019 404 551
– Length of 35-110 kV Conductors (along ROW) 0,4 51 295 51 284 51 337 51 391 51 410
– Length of 0.4-10 kV Conductors (along ROW) 0,7 323 634 324 968 326 319 326 993 328 810
– Length of 0.4-110 kV Cables 0,9 20 698 20 866 23 082 23 634 24 332
Capacity of Substations, MVA: 1,1 54 437 54 860 55 929 56 201 56 589
– Capacity of 35-110 kV Substations 0,4 34 545 34 747 34 941 35 063 35 102
– Capacity of 6-10/0.4 kV Transformer and Distribution Substations 2,4 19 892 20 113 20 988 21 138 21 487
Number of Substations, pcs: 1,2 103 553 104 425 105 915 106 319 107 692
– Number of 35-110 kV Substations 0,3 2 378 2 378 2 385 2 383 2 389
– Number of 6-10/0.4 kV Transformer and Distribution Substations 1,2 101 175 102 047 103 530 103 936 105 303
Number of c.u. 4,4 2 458 951 2 582 518 2 741 901 2 793 631 2 878 789
Number of Distribution Zones, pcs -7,2 257 257 217 218 219
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 35-110 kV Conductors (along ROW)1 broken down by Branches in 2019 – 2023

Graph
Km Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 0,8 4 287 4 278 4 270 4 303 4 306
Bryanskenergo 2,0 3 552 3 553 3 554 3 554 3 554
Voronezhenergo 0,0 6 805 6 793 6 784 6 778 6 778
Kostromaenergo 0,4 4 184 4 184 4 184 4 189 4 191
Kurskenergo 1,6 4 667 4 681 4 681 4 682 4 689
Lipetskenergo -0,5 3 822 3 811 3 816 3 823 3 821
Orelenergo 0,2 3 086 3 080 3 126 3 141 3 142
Smolenskenergo 0,3 6 047 6 055 6 056 6 056 6 060
Tambovenergo 0,3 4 879 4 879 4 886 4 886 4 887
Tverenergo 0,0 6 840 6 841 6 844 6 844 6 846
Yarenergo -0,2 3 127 3 127 3 135 3 137 3 137
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-10 kV Conductors (along ROW)1 broken down by Branches in 2019 – 2023

Graph
Km Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 1,0 37 439 37 645 37 764 37 915 38 301
Bryanskenergo 0,8 22 276 22 487 22 579 22 634 22 866
Voronezhenergo 0,7 43 935 44 270 44 418 44 575 44 776
Kostromaenergo 1,1 18 137 18 234 18 285 18 333 18 387
Kurskenergo 0,9 29 385 29 476 29 481 29 581 29 704
Lipetskenergo 0,9 24 932 25 034 26 223 26 314 26 553
Orelenergo 0,2 23 309 23 200 23 173 23 225 23 282
Smolenskenergo 1,0 33 166 33 307 33 495 33 697 33 949
Tambovenergo 0,5 22 701 22 760 22 360 22 373 22 461
Tverenergo 0,4 42 058 42 094 42 034 41 757 42 020
Yarenergo 0,6 26 296 26 459 26 508 26 591 26 510
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Length of 0.4-110 kV1 Cables broken down by Branches in 2019 – 2023

Graph
Km Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo -0,2 10 097 10 002 9 664 9 929 10 165
Bryanskenergo 0,6 147 179 181 222 331
Voronezhenergo 2,9 402 405 446 478 488
Kostromaenergo 3,1 1 685 1 704 1 744 1 753 1 766
Kurskenergo 8,6 298 308 318 320 344
Lipetskenergo 2,9 1 237 1 274 3 637 3 765 3 860
Orelenergo 1,0 146 166 182 177 180
Smolenskenergo 1,7 2 215 2 259 2 320 2 341 2 501
Tambovenergo 1,0 323 324 297 287 319
Tverenergo 1,2 945 977 1 000 1 017 1 029
Yarenergo 1,0 3 203 3 267 3 292 3 347 3 348
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 35-110 kV1 Substations broken down by Branches in 2019 – 2023

Graph
MVA Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 0,2 3 595 3 617 3 627 3 713 3 555
Bryanskenergo 0,5 2 449 2 489 2 606 2 606 2 624
Voronezhenergo -0,3 4 994 5 063 5 087 5 150 5 150
Kostromaenergo 0,0 1 780 1 780 1 774 1 773 1 774
Kurskenergo 3,4 3 603 3 593 3 594 3 653 3 657
Lipetskenergo 0,0 3 038 3 038 3 100 3 138 3 106
Orelenergo 1,6 1 909 1 910 1 926 1 895 1 945
Smolenskenergo 0,2 3 114 3 170 3 170 3 170 3 270
Tambovenergo 0,8 2 591 2 597 2 597 2 597 2 597
Tverenergo -1,1 4 212 4 211 4 196 4 148 4 205
Yarenergo 0,1 3 261 3 279 3 264 3 220 3 219
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 35-110 kV1 Substations broken down by Branches in 2019 – 2023

Graph
Pcs Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 0,0 181 182 182 184 185
Bryanskenergo 0,0 143 143 145 145 146
Voronezhenergo -0,7 296 297 298 300 300
Kostromaenergo 0,0 165 165 165 165 165
Kurskenergo 0,4 286 286 286 288 288
Lipetskenergo 0,0 201 201 204 206 205
Orelenergo 0,7 147 145 146 145 146
Smolenskenergo 0,0 253 254 254 254 256
Tambovenergo 5,7 221 221 221 221 221
Tverenergo -0,3 313 312 312 310 312
Yarenergo -1,7 172 172 172 165 165
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Capacity of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2019 – 2023

Graph
MVA Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 6,0 4 457 4 322 4 346 4 396 4 448
Bryanskenergo 2,5 790 818 829 838 899
Voronezhenergo 4,4 1 856 1 887 1 902 1 963 1 989
Kostromaenergo 0,1 1 548 1 544 1 534 1 533 1 537
Kurskenergo 0,0 1 659 1 661 1 665 1 669 1 681
Lipetskenergo 1,0 1 713 1 719 2 458 2 476 2 529
Orelenergo 2,2 916 926 917 930 918
Smolenskenergo 1,4 1 946 1 971 2 005 2 017 2 091
Tambovenergo 0,6 1 173 1 179 1 189 1 167 1 197
Tverenergo 0,4 1 954 1 973 1 988 1 986 2 016
Yarenergo 2,2 2 059 2 114 2 155 2 164 2 182
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of 6-10/0.4 kV1 Transformer and Distribution Substations broken down by Branches in 2019 – 2023

Graph
Pcs. Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 2,2 13 773 13 757 13 889 13 987 14 148
Bryanskenergo 0,5 5 974 5 968 6 014 6 060 6 197
Voronezhenergo 1,5 12 149 12 411 12 518 12 644 12 933
Kostromaenergo 0,5 6 509 6 517 6 487 6 480 6 502
Kurskenergo 1,0 9 440 9 529 9 545 9 589 9 747
Lipetskenergo 0,5 9 389 9 431 10 469 10 498 10 669
Orelenergo 1,2 5 890 5 876 5 786 5 788 5 766
Smolenskenergo 1,4 6 395 9 902 10 005 10 080 10 223
Tambovenergo 1,3 6 396 6 456 6 515 6 524 6 662
Tverenergo 0,6 12 583 12 673 12 717 12 708 12 839
Yarenergo 1,7 9 382 9 527 9 585 9 578 9 617
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Number of c.u.1 broken down by Branches in 2019 – 2023

Graph
C.u. Начальное изменение 2019 2020 2021 2022 2023
Belgorodenergo 5,0 367 076 381 168 395 735 402 858 410 023
Bryanskenergo 23,8 166 227 177 411 186 915 189 633 192 518
Voronezhenergo 7,0 291 100 306 566 320 390 326 332 331 037
Kostromaenergo 3,8 165 491 176 889 181 901 182 753 188 177
Kurskenergo 1,6 207 909 216 417 222 953 227 389 231 552
Lipetskenergo 0,7 186 398 193 798 221 293 225 978 230 588
Orelenergo 5,7 145 314 150 764 157 985 159 370 160 092
Smolenskenergo 4,3 300 633 309 467 312 165 331 204 334 459
Tambovenergo 3,2 146 890 148 428 174 008 174 884 185 272
Tverenergo 0,1 241 443 264 611 301 022 303 457 319 035
Yarenergo 0,2 240 470 256 999 267 532 269 773 296 036
1 – data presented with taking into account own and leased property, as well as property serviced under contracts

Level of physical deterioration of equipment1 in 2022 – 2023

Graph
Name of equipment Начальное изменение 31.12.2022 31.03.2023 30.06.2023 30.09.2023 31.12.2023
Conductors 0.4-20 kV none 73,5 73,7 73,4 74,0 74,1
Conductors 35-110 kV none 84,8 85,0 84,7 85,3 85,4
Conductors 0.4-110 kV none 76,4 76,5 76,3 76,8 77,0
Cables 0.4-20 kV none 68,8 68,8 68,5 69,3 69,5
Cables 35-110 kV none 40,5 41,4 40,6 43,4 39,2
Cables 0.4-110 kV none 63,5 63,7 63,5 64,4 63,8
Power lines 35-110 kV none 78,3 78,6 78,5 78,9 78,5
Power lines 3-20 kV none 73,9 74,1 73,8 74,4 74,6
Power lines 0.4 kV none 71,5 71,7 71,3 72,1 72,3
Transformer equipment 35-110 kV none 86,9 87,1 86,7 87,4 87,6
Transformer equipment 3-110 kV none 83,1 83,2 83,0 83,6 83,7
Switching devices 35-110 kV none 77,0 77,2 76,7 77,8 78,1
Switching devices 3-110 kV none 74,8 75,0 74,4 75,6 75,8
Substation equipment 35-110 kV none 81,3 81,5 81,0 82,0 82,2
Substation equipment 3-110 kV none 79,7 79,9 79,4 80,3 80,5
Total wear of Rosseti Centre none 76,0 76,2 75,8 76,6 76,6
1 – data presented with taking into account own and leased property, as well as property serviced under contracts