26 April 2012
IDGC of Centre – Smolenskenergo division reduces the risk of occupational injuries at electric power facilities
24 April 2012
Professionalism of staff - the key to successful operation during the autumn-winter period
18 April 2012
Tambov power engineers of IDGC of Centre told journalists on the results of the autumn-winter period operation
18 April 2012
A seminar for legal entities on the conclusion of direct contracts was held in Smolenskenergo
17 April 2012
Employees of Smolenskenergo receive permits for the right to work with hazardous waste and perform diagnostic tests and measurements
13 April 2012
Kurskenergo summarized the preliminary results of the autumn-winter peak load operation