* — the change is calculated on the basis of the indicators presented in the table and rounded to the nearest tenth
Начальное изменение
1Q 2017
1Q 2018
1Q 2019
1Q 2020
1Q 2021
1Q 2022
Supply to the grid, Billion kW*h
1.2
17.6
15.4
14.8
14.2
15.0
15.1
Productive supply1, Billion kW*h
1.3
15.7
13.5
13.0
12.5
13.3
13.3
Total losses, Billion kW*h
0.0
1.9
1.9
1.9
1.7
1.7
1.8
Total losses, %
0.02 п.п.
10.92
12.56
12.58
11.73
11.61
11.99
Electricity transmission services3, Billion kW*h
0.7
15.1
13.0
12.5
12.1
12.8
12.9
1 — productive supply within the joint operation (taking into account losses of TGOs) 2 — In the context of the composition of electric grid assets in 2018 (termination of the “last mile” agreements from 01.07.2017, as well as the integration of networks of the city of Nelidovo from 01.04.2018, were taken into account) 3 — Taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)
Electrical energy supply to the grid broken down by Branches in 2017-2022
* - the change is calculated on rounded to the first decimal place in the table
bln kW/h
Начальное изменение
1Q 2017
1Q 2018
1Q 2019
1Q 2020
1Q 2021
1Q 2022
Belgorodenergo
0.0
3.1
1.8
1.7
1.7
1.7
1.7
Bryanskenergo
0.0
1.0
1.0
1.0
0.9
0.9
0.9
Voronezhenergo
0.0
2.1
2.2
2.2
2.1
2.2
2.3
Kostromaenergo
0.0
0.6
0.7
0.6
0.6
0.7
0.7
Kurskenergo
0.0
1.4
0.8
0.8
0.8
0.8
0.8
Lipetskenergo
0.0
1.8
1.3
1.2
1.2
1.3
1.3
Orelenergo
0.0
0.6
0.6
0.6
0.5
0.6
0.6
Smolenskenergo
0.0
0.9
1.0
1.0
0.9
1.0
1.0
Tambovenergo
0.0
0.7
0.8
0.7
0.7
0.7
0.7
Tverenergo
9.1
1.2
1.2
1.2
1.2
1.3
1.3
Yarenergo
6.2
1.6
1.7
1.6
1.5
1.6
1.6
2 - Taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels (volume of electricity transmission services)
1Taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)
Structure of productive supply by voltage levels in 1Q 2022
* - change calculated with the rounded to the first decimal figures reflected in the table
Начальное изменение
1Q 2017
1Q 2018
1Q 2019
1Q 2020
1Q 2021
1Q 2022
Connected capacity, MW
6.6
208.3
151.4
107.1
419.3
173,2
215.7
Number of concluded contracts, pcs.
-8.4
8 337
7 758
7 099
6 933
8 915
9 863
Number of connections, pcs.
-1.0
7 783
7 458
5 870
6 945
7 218
8 922
including connections up to 15 kW, pcs.
-1.7
7 369
7 011
5 489
6 356
6 664
8 350
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days
-
130
76
97
66
62
64
Connected capacity broken down by Branches in 2017-2022