Operating results

Annual indicators

Electrical energy transmission in 2018 – 2022

Graph
Начальное изменение 2018 2019 2020 2021 2022
Supply to the grid, Billion kW*h -8,4 54,2 53,1 51,9 54,6 54,4
Productive supply1, Billion kW*h -9,2 48,5 47,7 46,8 49,2 48,8
Total losses, Billion kW*h 0,0 5,8 5,4 5,1 5,3 5,6
Total losses, % 0,74 10,60 10,23 9,83 9,76 10,24
Productive supply2, Billion kW*h -9,1 47,0 46,4 45,5 47,8 47,6
1 – productive supply within the joint operation (taking into account losses of TGOs)
2 – taking into account the volume of services for the transmission of electrical energy in the territory of the «pick-up» of the functions of the supplier of last resort (boiler productive supply)

Electrical energy supply to the grid broken down by Branches in 2018 – 2022

Graph
bln kWh Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo 0,0 7,5 7,1 6,9 7,0 7,0
Bryanskenergo 2,2 3,8 3,7 3,5 3,7 3,7
Voronezhenergo 3,7 9,3 9,2 9,2 9,7 9,7
Kostromaenergo -26,5 2,8 2,7 2,6 2,7 2,6
Kurskenergo -19,4 3,6 3,6 3,5 3,7 3,7
Lipetskenergo 0,0 5,4 5,3 5,4 5,7 5,7
Orelenergo 0,0 2,5 2,4 2,4 2,4 2,4
Smolenskenergo -3,2 4,0 3,9 3,7 4,0 3,9
Tambovenergo 0,0 3,0 2,9 2,9 3,0 3,0
Tverenergo -1,5 5,6 5,5 5,4 5,7 5,8
Yarenergo -25,7 6,7 6,7 6,5 7,0 6,9

Electrical energy of productive supply1 broken down by Branches in 2018 – 2022

Graph
bln kWh Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -26,9 6,8 6,4 6,3 6,4 6,3
Bryanskenergo 0,0 3,6 3,5 3,3 3,5 3,5
Voronezhenergo 3,7 8,5 8,5 8,4 9,0 8,9
Kostromaenergo 0,0 2,4 2,4 2,3 2,5 2,4
Kurskenergo -27,3 3,2 3,2 3,1 3,2 3,3
Lipetskenergo -20,0 4,8 4,7 4,8 5,0 4,8
Orelenergo 0,0 2,2 2,2 2,2 2,2 2,2
Smolenskenergo 2,9 3,5 3,4 3,3 3,5 3,4
Tambovenergo -6,9 2,7 2,7 2,7 2,7 2,8
Tverenergo 0,0 4,7 4,7 4,6 4,9 5,0
Yarenergo -1,6 6,0 6,1 5,8 6,3 6,2
1 – productive supply within the boiler (including losses of TGOs)

Electrical energy of total losses broken down by Branches in 2018 – 2022

Graph
% Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo 2,43 10,25 10,07 9,51 9,66 9,69
Bryanskenergo 0,40 5,94 4,95 5,48 5,20 5,14
Voronezhenergo -0,37 8,78 8,28 8,07 7,74 8,06
Kostromaenergo -0,07 11,78 11,32 10,35 7,81 9,39
Kurskenergo 3,03 12,36 11,23 11,75 11,52 11,02
Lipetskenergo 1,41 10,90 11,52 10,01 11,95 15,32
Orelenergo -0,20 10,21 9,28 8,99 8,67 8,69
Smolenskenergo -0,68 12,46 12,77 12,34 12,53 12,71
Tambovenergo 0,75 7,58 7,01 7,11 8,30 8,44
Tverenergo 0,07 16,69 15,55 14,55 13,52 13,97
Yarenergo -0,14 9,78 9,91 9,81 9,46 9,15

Volume of electrical energy transmission services2 broken down by Branches 2018 – 2022

Graph
bln kW/h Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -27,7 6,8 6,4 6,3 6,4 6,4
Bryanskenergo -2,8 3,5 3,5 3,3 3,4 3,5
Voronezhenergo 3,8 8,1 8,1 8,1 8,6 8,5
Kostromaenergo 0,0 2,4 2,4 2,3 2,5 2,4
Kurskenergo -28,6 3,0 3,1 3,0 3,1 3,2
Lipetskenergo -20,7 4,6 4,5 4,6 4,8 4,8
Orelenergo 0,0 2,1 2,1 2,1 2,1 2,1
Smolenskenergo 2,9 3,5 3,4 3,2 3,5 3,4
Tambovenergo 0,0 2,8 2,8 2,7 2,7 2,8
Tverenergo 0,0 4,5 4,4 4,4 4,7 4,7
Yarenergo -1,7 5,7 5,8 5,6 6,0 5,9
2 – taking into account the volume of services for the transmission of electric energy in the territory of the "pick-up" of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels (volume of electricity transmission services)

Graph
% Начальное изменение 2018 2019 2020 2021 2022
High voltage (110 kV и выше) -6,2 36,8 36,0 34,1 33,8 32,7
Medium voltage (35 kV) 0,4 4,6 4,4 4,3 4,1 4,0
Medium voltage (10-6 kV) 2,6 23,3 23,8 24,2 24,3 24,6
Low voltage (0,4 kV) 0,8 9,2 9,4 9,3 9,5 9,7
Population 1 2,4 26,0 26,4 28,1 28,3 29,0
1 – taking into account the volume of services for electricity transmission in the territory of “pick-up” of the functions of the supplier of last resort (boiler productive supply)

Structure of productive supply by voltage levels in 2022

Grid Connection

Grid connection in 2018 – 2022

Graph
Начальное изменение 2018 2019 2020 2021 2022
Connected capacity, MW 0,2 867,5 840,3 1013,3 821,0 944,2
Number of concluded contracts, pcs. -1,5 43 963 38 531 36 168 44 910 47 084
Number of connections, pcs. -5,5 39 984 38 063 30 213 38 098 39 659
including connections up to 15 kW, pcs. -7,9 37 149 35 456 27 493 27 493 36 846
Average term of performance of grid connection contracts with activities on the part of the grid company (“contract-notification”) under the Doing Business category, days -16,2 83 79 61 60 71

Connected capacity broken down by Branches in 2018 – 2022

Graph
MW Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -9,2 169,4 148,6 135,0 137,8 143,0
Bryanskenergo 18,3 32,3 36,5 37,8 36,1 44,2
Voronezhenergo -19,7 103,9 84,4 399,3 143,4 159,4
Kostromaenergo 21,9 70,6 61,2 50,7 54,0 60,5
Kurskenergo 16,5 49,3 50,6 50,1 39,1 56,7
Lipetskenergo -1,1 104,7 65,5 49,0 68,1 92,4
Orelenergo 31,8 47,7 49,0 33,0 27,9 32,3
Smolenskenergo -4,7 64,5 98,2 60,1 84,9 91,3
Tambovenergo -16,4 35,7 36,1 20,0 30,5 42,9
Tverenergo 8,4 88,0 79,7 65,4 86,3 110,7
Yarenergo 14,3 101,3 130,6 113,0 112,8 110,8

Number of concluded contracts broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -13,0 7 422 6 351 6 060 138 6 056
Bryanskenergo 46,0 1 583 1 167 1 256 36 1 584
Voronezhenergo -6,0 5 074 4 777 5 494 143 6 498
Kostromaenergo -21,8 3 854 3 555 2 927 54 3 767
Kurskenergo -0,3 2 303 1 995 2 049 39 2 688
Lipetskenergo -3,1 3 521 3 406 3 514 68 5 400
Orelenergo 31,4 2 914 2 160 1 849 28 1 787
Smolenskenergo 21,8 4 517 3 118 3 082 85 4 136
Tambovenergo 3,0 1 527 1 614 1 266 30 1 329
Tverenergo -4,4 5 581 5 341 4 347 86 5 773
Yarenergo 3,3 5 667 5 047 4 324 113 4 675

Number of connections broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -21,9 7 011 6 433 5 438 7 069 6 804
Bryanskenergo 0,9 1 445 1 336 1 022 1 672 1 521
Voronezhenergo -23,3 4 134 4 772 4 872 6 261 5 049
Kostromaenergo 8,7 4 841 3 603 2 807 3 095 2 846
Kurskenergo -3,0 2 072 2 071 1 832 2 135 2 240
Lipetskenergo -7,0 3 371 3 068 2 476 3 483 5 024
Orelenergo 22,7 2 691 2 573 1 601 1 557 1 352
Smolenskenergo 0,7 3 386 3 017 2 231 3 470 3 373
Tambovenergo -1,1 1 293 1 552 628 936 2 018
Tverenergo 4,5 5 011 4 586 3 308 3 820 4 824
Yarenergo 1,9 4 729 5 052 3 998 4 600 4 608

Number of connections up to 15 kW broken down by Branches in 2018 – 2022

Graph
pcs. Начальное изменение 2018 2019 2020 2021 2022
Belgorodenergo -26,3 6 238 5 759 4 761 6 455 6 248
Bryanskenergo -1,9 1 348 1 236 954 1 577 1 429
Voronezhenergo -25,1 3 890 4 588 4 542 6 003 4 629
Kostromaenergo 5,8 4 491 3 267 2 492 2 822 2 549
Kurskenergo -5,0 1 949 1 980 1 710 2 030 2 093
Lipetskenergo -9,9 3 063 2 860 2 301 3 282 4 718
Orelenergo 22,9 2 621 2 488 1 538 1 499 1 308
Smolenskenergo -2,4 3 116 2 699 1 908 3 171 3 123
Tambovenergo -2,1 1 186 1 440 537 838 1 886
Tverenergo 3,5 4 860 4 446 3 175 3 627 4 582
Yarenergo -0,2 4 387 4 693 3 575 4 343 4 281

Connected capacity structure by categories of applicants in 2018 – 2022

Graph
% Начальное изменение 2018 2019 2020 2021 2022
Up to 15 kW -2,5 47,6 46,9 31,0 51,6 46,0
From 15 to 150 kW 8,3 19,8 21,1 19,2 22,3 22,1
From 150 to 670 kW -0,9 10,9 9,0 7,4 6,7 7,6
670 kW and above -4,9 21,7 23,0 42,4 19,4 24,3

Connected capacity structure by categories of applicants in 2022