IDGC of Centre was incorporated in December 17, 2004 and operates in the area of 457.7 thousand square kilometers with the population of 13.6 million people. The length of 0,4-110 kV power lines is more than 379 thousand kilometers (along ROW). 11 grid divisions provide transmission and distribution, as well as new customer connections to the power grid from 0.4 to 110 kV. The structure of IDGC of Centre includes the following divisions: Belgorodenergo, Bryanskenergo, Voronezhenergo, Kurskenergo, Kostromaenergo, Lipetskenergo, Tverenergo, Smolenskenergo, Orelenergo, Tambovenergo and Yarenergo.